
Originally Posted by
Bugzie
OK Mark you know all that. What's the story? Great price??? 48box???
A fair price on a later model, well maintained, turn-key system.
We have a few events through the summer where a good sized sledgehammer of a system is required (10K- 15K attendence). Our current sledgehammer is "adequate", and probably will continue to be adequate for here-on out... but if we're already (and have been for 10+ years) moving the tonnage... why not move really cool tonnage?
I'm not going to live forever... I've figured that out. Tonnage is tonnage... and we have minds and hands and can figure out ways & means to deal with tonnage... we can have fork lifts & backhoes at both ends if need be, and the van, 20ft. box truck, and 48ft. semi trailer/truck combination all make about the same milage... and we already have all of that, and those are already sunk costs.
Flying an equitable line array requires a load bearing roof... and we don't have that... probably won't either. Besides: ground stacking is fine for what we do... sight-lines are not a problem, nor is square footage. Weather can be an issue... I'm thinking an 850 rig is as weather resistant as most anything else. "Cutting edge" flavor of the month never comes into play. There's plenty of opportunity in the local area for a bigger sledgehammer if we had it.
You only live once.