Hey guys I recently was commissioned to find and decide on an all new live stage gear. Also I set it up and tuned the system. All gear included new board,mains,subs,in ear monitors and included recording software. I am also teaching someone to run it all before I depart. I have over 10 years touring experience and a degree in music business and production. I have recorded bands prior to this but have never done anything like this and have not a clue what to charge these good people? I would so so appreciate anyone with experience in this situation informing me what they themselves have charged for this type of work. Thank you all very much.

Link to comment
Share on other sites

  • Members

 


truthfamilyfaith wrote:

 

Good call . I've easily done 50 hrs so far. So 100 an hr is a fair price? I really appreciate you guys giving me some of your wisdom.

 

Keep in mind that a professional charging 90-150/hr might have done the job in a lot less than 50 hrs. Also a pro would have supplied the customer with an estimate before the job started

Link to comment
Share on other sites

  • Members

Also true. Although I am far from a beginner you make a good point. It's not like I've been getting paid setting up gear for years. The set up didn't take long it was learning the board and tuning in everyone's in ears. The boards a presonus 24 digital board. So let's mark me experienced but not a problem, how much would you charge?

Link to comment
Share on other sites

  • Members

 

I believe this is something you should have discussed with your client, prior to determining your fee. You've really got to be clear with the customer,,, presenting a reasonable and itemized estimate, before proceeding. When you're charging $150./hr as an itemized cost,,, let's say "labour", you might be paying a truck-driver, a couple of grunts doing the heavy lifting, and your supervision out of that $150./hr. Otherwize, you'd have to be doing some very high-tech analysis to charge that kind of fee.

 

I know that if someone offered to help me understand a console, and spent 40-50 hours doing so, and then told me afterwards I owed him $150./hr,,,,,($7500.),,,,,,,, things would probably deteriorate VERY quickly.from there. Just sayin'

Link to comment
Share on other sites

  • Members

 


truthfamilyfaith wrote:

 

Also true. Although I am far from a beginner you make a good point. It's not like I've been getting paid setting up gear for years. The set up didn't take long it was learning the board and tuning in everyone's in ears. The boards a presonus 24 digital board. So let's mark me experienced but not a problem, how much would you charge?

 

I am not going to suggest a dollar amount. I am just going to bring up a couple of points for you to factor into your calculations.

I'm sure you are not a beginner at  certain things in the industry but the job you describe in this thread may not be one of them. You spec'd a system for your client that included a digital mixer that you were unable to navagate on and now want the client to pay for you to learn it. Not pro.

I am going to assume that you were tuning monitors for a band . I don't know the size of the band so I will guess at 5-8 people. An experienced sound tech with monitor chops should be able to tune a monitor rig in 1 to 2 hours and then I suppose another 1 to 2 hours for the band to rehearse with the new system.

This is starting to look like less than 50 billable hours

Link to comment
Share on other sites

  • Members

I'm guessin' it's a church so they are used to paying big bucks for stuff wink.gif. A1 pay hereabouts is $25/hr so I'd be embarrassed to ask for more and I'd not charge for the time spent learning what I already should know. Doesn't sound like he did any high level system design above what an A1 would do?

Link to comment
Share on other sites

  • Members

 


truthfamilyfaith wrote:

 

That's assuming too much I'm afraid. It's for a venue that has different acts in weekly. I also did not volunteer my services saying I know everything as you seem to suspect a "pro" to know. I'll be taking my question to a a forum with less un constructive arrogance. Account deleted.

 

Wow! Awfully thin-skinned and sensitive. 

Link to comment
Share on other sites

  • Members

 


agedhorse wrote:

 

Disrespectful IMO. Seeing more of this lately in the forum, as well as in my day job. What gives?

 

I'm seeing it worldwide. The economy is going to hell and people are getting desperate, angry and acting out. I'm guessin' this guy REALLY needs those dollars and doesn't want us saying he's not entitled to them.

Link to comment
Share on other sites

  • Members

 


agedhorse wrote:

 

Disrespectful IMO. Seeing more of this lately in the forum, as well as in my day job. What gives?

 

It's the new layout. Apparently its effects were greater than anticipated. Unintended consequences and all that. It is odd though, how friendly he was when the price was projected at $100-150/hr.

Link to comment
Share on other sites

  • Members

 


truthfamilyfaith wrote:

 

Well they purchased over 10 grand in new gear so I'm thinking 5-7 extra might not kill them. I agree I hated asking this in a forum because it's really all to do with circumstance but I had no idea where else to look. Like the first poster said I believe 90-100 is pretty fair.

 

If they spent 10 Grand on equipment, you're going to charge $5000 ($50x100) hours for labor? That is 33% of the project. That doesn't really seem right to me.

Sorry, that you didn't like the answers to your question but 10 grand in real live audio doesn't buy much in equipment. I easily have 4+ just in mics.

Link to comment
Share on other sites

  • Members

 


agedhorse wrote:

 

Disrespectful IMO. Seeing more of this lately in the forum, as well as in my day job. What gives?

 

More likely it's someone who doesn't have to clue what their doing and think they can milk the cow. Who doesn't put out a quoted price before the project starts? If someone comes back to me expecting $5000 in the end without any prior knowledge, I would tell them to hit the road. Maybe he's charging for the trip to Guitar Center to pick up some of the equipment and shipping/transit times also.

There is definitely some miscommunication on someone's part here. "You mean you weren't helping us out for free???"

Link to comment
Share on other sites

  • Members

There are a lot of angry people out there Aged. 

 

The only thing I can say about the guys post is he put in a a 10k system which really is NOT that much.

Charging half that value (5k) to install 10k of gear is well ridiculous.

One can install two 5k subwoofers  in one hour or two :)

 

 

 

 

 

 

 

Link to comment
Share on other sites

  • Members

I did some troubleshooting for a small installed system that was having a lot of trouble. The manager wanted me to come down, have a look and then help them pick out a new amp, mixer and speakers. They figured they were toast. We talked a little bit about that on the phone. They liked the peavey setup in the other lounge, the problem was the small EV setup in their other lounge.

 

Since it was intermittent I just had this feeling it had to be the wiring. Their maintenance guy was there and he did most of the wiring. It was a bit of a rats nest.

 

We finally traced the problem, due to ruling things out and almost starting from scratch. It took 2.5 hours from walking in the door to when I left. The manager asked how much, I said $100, she said no problem.

 

She told me she asked the maintenance guy if it was worth it bringing me in, and he said "if Rob never came, we would still have the problem, and now we don't need to replace anything." So that was good to hear.

 

So that shakes out to $40/hr, which we both felt was fair.